energyNP.com  
Tel
98510-91900¡¡
Email
energyNP@hotmail.com¡¡
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy
 
  Relekhola Hydropower Project to start production by mid-May

The construction of the six-megawatt Relekhola Hydropower Project has been completed in Narchyang of Annapurna Rural Municipality-4 of Myagdi.

The testing has begun with the completion of the construction of the project's infrastructure.

Public Relations Officer of the project Homanath Pandey said that all the physical infrastructure to be built in the hydropower project has been completed and testing has begun.

According to him, preparations are being made to start electricity production within mid-May this year.

He said, "The pipeline connected to bring water from the dam to the power house has been filled with water and the testing has begun by a technical team. The work of construction of the physical infrastructure and installation of equipment has been completed and the work of electrical testing has reached the final stage."

Pandey said that a dam has been built in Kalokhola at the foot of Khopralek.

Similarly, two 50-metre-long water desander ponds and a power house have been built in Relekhark, and a 3,600-metre-long pipeline has been installed from the dam to the power house, he said.

A five-kilometer transmission line with a capacity of 33 kV has been constructed to connect the Relekharka power house, switchyard, and Dana substation.

The structure and equipment to generate electricity by dropping water from a height of 505 metres to the power house have been constructed and installed.

The project whose construction began in 2079 B.S. with a target of completing it in two years, was affected by the flood in last September, which damaged the dam and intake built at Kalokhola.

Public relations officer Pandey said that the project is being operated by building a temporary dam and dropping water in the desander.

Himalayan and Rastriya Banijya Bank have extended a loan of Rs. 1.2 billion for the project.

The project has constructed 17-kilometre access road from Beshigaun of Narchyang to the dam and power plant construction site via Lekgaun.

[ 27 April, 2025 / risingnepaldaily.com ]¡¡¡¡¡¡
 
¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Electric Folded Treadmill Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries