energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Industries pay first installment of electricity dues

Industries whose electricity supply had been disconnected for failing to pay premium tariffs under the dedicated and trunk electricity lines have begun clearing their outstanding dues.

The payments are linked to a long-standing dispute over premium charges for using dedicated and trunk power lines during years of load-shedding.

The Nepal Electricity Authority (NEA) has been collecting these dues, often through installment plans, and has disconnected power to many non-paying industries to encourage settlement.

The Authority had disconnected the lines of 25 industries for non-payment, in line with its tariff collection regulations on October 24, this year. Following the disconnection, over a dozen of companies have started settling their outstanding payments in installments within a few days.

Among them, Sonapur Minerals and Oil Limited, operating in Ghorahi, Dang, paid the first installment of its outstanding premium for electricity consumed from dedicated and trunk lines during the load-shedding period in the past, said the NEA.

Following the payment, its power supplies, which had been disconnected on October 24, was reconnected on Tuesday evening, according to the Nepal Electricity Authority.

According to NEA, Sonapur Minerals had an outstanding amount of Rs. 242.99 million.

The company has agreed to pay the dues in 28 installments, and has already cleared the first installment of Rs. 8.63 million for the electricity consumed between February 2016 to May 2018 through dedicated and trunk lines.

Similarly, Shivam Cement, based in Hetauda, Makawanpur, has also started paying its long-pending premium tariff for electricity consumed under the dedicated and trunk lines during the same period.

After paying the first installment on Monday, the power supply, which had been disconnected on October 24, was reconnected the same day, said the NEA.

Shivam Cement has total arrears of Rs. 668.9 million, which will also be settled in 28 installments. The company has paid the first installment of Rs. 23.8 million.

Likewise, Triveni Synthetic Yarn Industries Pvt. Ltd, Reliance Spinning Mills, Panchakanya Plastic Industries, Panchakanya Steel Industries, Siddhartha Pet Plant, Shyam Plastic, Hulas Steel, Ashok Steel, Hama Iron and Steel, Samrat Cement, Rolpa Cement, and Nawa Nepal Plastic Industries paid their first installment a few days ago.

Reliance’s total arrears of Rs. 753.7 million have been split into 28 installments, with the first payment of Rs. 27.7 million made. Similarly, Triveni Synthetic has total arrears of Rs. 43.983 million, which have been divided into 28 installments. It paid the first installment of Rs. 1.57 million a few days ago, said the NEA.

[13 November, 2025 / risingnepaldaily.com ]   
 
 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries