energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Raw material dearth delays Mungling–Malekhu road

Road construction under the Nagdhunga–Mungling Road Project (Western Section) has been affected due to a shortage of construction materials, raising concerns about the timely completion of the project. The western section of the Nagdhunga–Mungling Road Project covers the stretch from Mugling to Malekhu.

Although a contract has already been awarded to extract the required construction materials from the Lamabagar area along the Trishuli River near Malekhu, construction companies involved in the project have been unable to extract materials due to obstruction by local residents.

Project Chief Sajana Adhikari of the Project (Western Section) said the lack of construction materials has directly impacted road construction works. An Environmental Impact Assessment (EIA) has approved the extraction of 74,000 cubic metres of construction materials from the area.

Following the project’s approval, a contractor was appointed to extract materials accordingly. However, locals have imposed conditions preventing material extraction, and no materials have been obtained to date.

“We have not been able to extract gravel, sand and other materials from the site since the project began,” Adhikari said, adding that repeated discussions with local residents have failed to resolve the issue.

Talks were held again on Saturday, but without any breakthrough. Continued insistence by locals not to allow material extraction from Lamabagar poses a serious risk to the progress of road construction, she warned.

Due to the obstruction, construction materials are currently being transported from Jugedi in Chitwan and from Nuwakot, significantly increasing costs. “Bringing materials from distant locations raises expenses to the extent that contractors may find it difficult to continue work,” Adhikari said, stressing the need for cooperation from local governments and residents.

Campaign groups advocating for the protection of the Trishuli River have also opposed material extraction. Local residents argue that the area is used for fairs and festivals, and that extracting materials would cause problems.

Chief District Officer of Dhading, Bijaya Raj Subedi, said local obstruction has created difficulties for the project. “The demands are at the local level and should be addressed by the concerned local government. Development works should not be obstructed,” he said.

Despite several rounds of discussions to resolve the dispute, no solution has been reached so far. He added that efforts would resume after the completion of election-related responsibilities, including the nomination process.

According to Subedi, local government leaders and elected representatives have not shown adequate initiative to resolve the dispute, even though three years have passed since the road expansion project began.

Although contracts were awarded at the outset to extract materials from Lamabagar, no effective steps have been taken by the local level to date.

Benighat Rorang Rural Municipality Chairperson Krishna Bahadur Thapaliya said he was generally aware of the issue but had not been able to focus on it due to time constraints. “I have heard there is a dispute. I could not give it attention due to lack of time, but I will look into it,” he said.

Meanwhile, the municipality’s Chief Administrative Officer, Ram Babu Paudel, said the rural municipality itself has not created any obstruction. “We have received information that locals are protesting. The CDO is working towards a solution at the district level. There is no obstruction from our side,” he said.Project Chief Adhikari emphasised that development works can only gain momentum if local governments, administration and stakeholders work together to resolve the dispute.

The project involves road expansion and blacktopping along a 38.86-kilometre stretch from Mugling to Malekhu.

According to the project office, around 37 per cent of the work has been completed so far, with 11-km already blacktopped. Preparations are under way to blacktop the remaining sections.

The project was contracted at a cost of Rs. 4.80 billion. Sharma ZICG JV was awarded the contract, and the agreement was signed in December 2022. The project was originally scheduled for completion by mid-January 2026, but the deadline has been extended after delays.

[ 19 January 2026 / risingnepaldaily.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries