energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Nepal Electricity Authority Approves Conditional 2-Year Extension of RCOD for Hydropower Projects

The Nepal Electricity Authority (NEA) has decided to extend the RCOD (Required Commercial Operation Date) of hydropower projects by up to a maximum of two years. The decision was made during a Board of Directors meeting held on Tuesday, based on applications submitted by project developers.

According to a board member, if delays are proven to have occurred due to “force majeure” provisions mentioned in the Power Purchase Agreement (PPA), the RCOD will be extended along with escalation benefits. However, projects delayed for reasons other than force majeure will not receive escalation for the extended period.

Hydropower projects are generally entitled to an annual tariff escalation of around 3 percent. Tariff adjustment (escalation) is determined based on eight criteria specified in the PPA. As per the new decision, no penalties will be imposed during the extended RCOD period.

RCOD refers to the fixed date by which a hydropower project must begin commercial electricity generation under its Power Purchase Agreement (PPA) with the NEA. If production does not begin within the stipulated time, penalties are applied. However, the date can be extended in cases of floods, landslides, or other unforeseen problems.

Hydropower developers have long been demanding an extension of RCOD. They have complained that delays in forest clearance, failure to obtain approvals from various government agencies, and natural disasters such as floods and landslides have made it difficult to complete projects on time. In particular, they say that projects often remain stalled for years due to the lack of forest approval.

The decision to extend RCOD was made based on a report prepared by a subcommittee. The subcommittee had been formed during the tenure of Energy Minister Deepak Khadka, who directed it to prepare the report. The Board has approved that report. Hydropower projects with a combined capacity of nearly 3,000 megawatts will benefit from the RCOD extension.

Meanwhile, the Board has also relaxed certain hydrology-related provisions. Previously, hydrology revisions were allowed only five years after the start of production. This period has now been reduced to three years. The decision was made in response to situations where developers had to pay penalties due to lower-than-expected electricity generation.

Similarly, the requirement to inform the authority about the expected volume of electricity generation one month in advance has been amended. Developers will now need to provide such information just one week in advance.

Nepalpurbadhar

[ 19 February 2026 / nepalenergyforum.com ]   
 

Lithium Iron Phoaphate (Lifepo4) Battery - Wall Mounted Energy Storage Lithium Battery - Nepal - Kathmandu

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries