energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Transmission Line Works to Clear Over 9,000 Trees Under Tanahu Hydropower Project

A total of 9,127 trees will be removed for the construction of a transmission line under the Tanahu Hydropower Project.

With the acquisition of user rights over 92.7 hectares of forest land in Tanahun and Chitwan districts for the construction of the Damauli–Bharatpur 220 kV transmission line under Package–3 of the project, permission has now been granted to clear the trees and vegetation in the designated area.

According to Project Chief Shyamji Bhandari, an agreement has recently been signed between Tanahu Hydropower Limited and the Department of Forests and Soil Conservation, in line with a Cabinet decision, to allow the use of forest land within the transmission line tower sites and right-of-way corridor, as well as the removal of trees and plants. He added that a formal letter has already been sent to the Division Forest Office, Chitwan, to implement the agreement.

Construction of the transmission line had been affected due to delays in obtaining the necessary approvals.

Package–3 has been awarded to India’s KEC International Limited. Of the 94 towers to be constructed along the 33-kilometer Damauli–Bharatpur 220 kV transmission line, foundation work has been completed for 78 towers, and 69 towers have already been erected. The project office stated that overall physical progress under this package has reached around 75 percent.

The Tanahu Hydropower Project is being implemented through three packages. Under Package–1, construction of the dam and related structures is being carried out by Song Da-Kalika JV . According to Bhandari, this package has achieved 54 percent progress so far. Major works completed include hill cutting for the main dam, construction of access roads, building a temporary dam to divert the Seti River, and the construction of two diversion tunnels, among other structures.

For the construction of the main dam, the Seti River was diverted on November 6, 2023. It has been reported that construction of temporary dams on both the upstream and downstream sides of the main dam was completed in May 2024.

Under Package–2, the construction of the powerhouse and installation of related equipment is being carried out by China’s Sino hydro Corporation. According to Bhandari, excavation work for the underground structures has been completed, and most of the civil construction of these structures has also been finished. Major concreting works for the powerhouse, cable tunnel, surge tank, tailrace, and other structures have been completed, bringing overall progress of this package to around 73 percent.

According to Project Chief Bhandari, the civil works of the powerhouse are nearly complete, while electromechanical installation is currently underway. Roofing work at the powerhouse, along with water management and other related tasks, is in progress.

Jalasarokar

[ 28 February 2026 / nepalenergyforum.com ]   
 

Lithium Iron Phoaphate (Lifepo4) Battery - Wall Mounted Energy Storage Lithium Battery - Nepal - Kathmandu

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries