energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Middle Kaligandaki Hydropower Project Achieves Key Adit-01 Breakthrough

The breakthrough of Adit-1 tunnel has been achieved at the 66.3 MW Middle Kaligandaki Hydropower Project, which is under construction in Annapurna Rural Municipality of Myagdi. On the underground structure side of the project, Audit-1 has been successfully connected to the Head Race Tunnel (HRT) alignment.

The breakthrough of Adit-1 was completed by Hydro Support Pvt. Ltd., a company under the IME Group. Angel Engineering Consultant Pvt. Ltd. is serving as the project consultant, while Rasuwa Multi JV is the main contractor. According to the company, construction of the headworks, powerhouse main access tunnel, tailrace tunnel, and access road towards the surge shaft is currently progressing simultaneously.

It has been stated that NPR 97.024 million has been allocated for social responsibility and environmental impact mitigation during the hydropower project construction. The project is expected to be completed within four years from the start of construction. The estimated total cost for completing the project is NPR 12.936475 billion.

Seventy-five percent of the project investment has been arranged through debt financing and 25 percent through equity. The equity portion will be invested by the IME Group and the general public. Under co-financing arrangements, the participating banks will invest NPR 11.12 billion in loans, including interest during the construction period.

Of the total loan amount, Nabil Bank will contribute NPR 3.12 billion; Everest Bank and Nepal Investment Mega Bank will each invest NPR 2 billion; while Nepal Bank, Rastriya Banijya Bank, and Prabhu Bank will each provide NPR 1 billion.

The project’s powerhouse will be underground. Wards 2, 3, 4, 5, and 6 of Annapurna Rural Municipality will be affected during construction. The project includes a 4,319-meter-long tunnel. Upon completion, the generated electricity will be connected to the national transmission line through the substation located at Dana in Annapurna Rural Municipality–3.

As per the Power Purchase Agreement (PPA) with the Nepal Electricity Authority, the winter tariff has been fixed at NPR 8.40 per unit and the monsoon tariff at NPR 4.80 per unit. Based on these rates, the project is expected to generate NPR 1.09 billion in revenue from 130 GWh of electricity during winter, and NPR 1.33 billion from 277 GWh during the monsoon season. In total, the project will produce 407 GWh annually, generating an estimated annual revenue of NPR 2.42 billion.

Urjasanchar

[ 1 March 2026 / nepalenergyforum.com ]   
 

Lithium Iron Phoaphate (Lifepo4) Battery - Wall Mounted Energy Storage Lithium Battery - Nepal - Kathmandu

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries