energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Work Progresses on Upper Tamor A 60 MW Hydropower Project

The construction process of the 60 MW “Upper Tamor A Hydropower Project” has progressed. The Department of Electricity Development (under the Ministry of Energy, Water Resources and Irrigation) has issued a public notice stating that, for the first time, on January 24, 2025, a notice was published and that the Environmental Impact Assessment (EIA) and Feasibility Study Report (FSR) for the proposed project have been approved. Therefore, necessary procedures are being carried out in accordance with the prevailing laws.

The proposed project is planned to be constructed on the Tamor River in Faktanglung Rural Municipality, Taplejung District, Koshi Province. This run-of-the-river type project will have an installed capacity of 60 MW.

According to the Electricity Act, 1992, and the Electricity Regulations, 1994, the department called for applications on January 3, 2024. On this basis, the Environmental Impact Assessment (EIA) report was approved by the Ministry of Forests and Environment on October 8, 2023. Additionally, the Feasibility Study Report was completed in February 2022, the department stated.

The project is estimated to generate approximately 332.27 GWh of electricity annually. For the project, a concrete OG-shaped gravity dam, about 25 meters long and 5 meters high, will be constructed on the Tamor River. The dam’s crest elevation will be 2,345 meters above sea level, and the maximum water level will reach 2,351 meters.

Water from the dam will be conveyed through a 640-meter-long headrace tunnel and a 5-meter-diameter penstock pipe to an underground powerhouse. Two turbines, each with a capacity of 30 MW, will be installed in the powerhouse, producing a total of 60 MW of electricity.

The generated electricity will be transmitted via a 132 kV transmission line to the Basantpur Substation in Sankhuwasabha District, approximately 45 km away. Water will be returned to the Tamor River from the project’s tailrace. The construction of the project is expected to be completed within 45 months.

The department stated that measures outlined in the approved EIA report will be followed to minimize impacts on biodiversity, wildlife, and local communities around the dam and powerhouse areas.

During project implementation, mitigation measures will be adopted to address soil erosion, air pollution, and other potential environmental impacts.

The Department of Electricity Development has urged stakeholders to contact the relevant authorities for further information regarding the project.

Once implemented, this project is expected to enhance electricity production and strengthen the national power system, thereby further increasing the energy production capacity of Koshi Province.

Jalasarokar

[ 3 March 2026 / nepalenergyforum.com ]   
 

Lithium Iron Phoaphate (Lifepo4) Battery - Wall Mounted Energy Storage Lithium Battery - Nepal - Kathmandu

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries