energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Manang Moves Toward National Grid Linkage as 135 MW Marsyangdi Project Accelerates

The Himalayan district of Manang, which has so far depended on electricity generated from small hydropower projects, is set to be connected to the national transmission grid for the first time. The 135 MW Manang Marsyangdi Hydropower Project, currently under construction in Naso Rural Municipality–8 and 9 of Manang, is expected to mark a new chapter in the district’s energy sector.

The project, being built by utilizing the water resources of the Marsyangdi River, is one of the large hydropower projects developed by the private sector. Based on a “run-of-river” model, the project will generate electricity by diverting river water through a dam and transporting it via a tunnel to the powerhouse.

Compared to reservoir-based projects, run-of-river projects are preferred due to lower construction costs, relatively minimal environmental impact, and shorter construction periods.

The project has a gross head of 430.20 meters and a headrace tunnel length of 6.075 kilometers. The total estimated cost is NPR 33.38 billion, with 20 percent equity investment and 80 percent loan financing. Butwal Power Company holds a 20 percent stake, while three Chinese companies collectively hold the remaining 80 percent.

An agreement was signed on December 18, 2022, between the Government, Butwal Power Company, and Chinese investors to complete the project within four years. The project is expected to generate 750.948 million units of electricity annually.

Construction work - including access roads, tunnels, dams, powerhouse, and transmission lines - is being carried out simultaneously. Despite challenges posed by mountainous terrain, landslides, snowfall, and harsh weather conditions, construction has been accelerated, according to project officials.

It has been stated that road upgrades were necessary to transport large turbines, generators, and other equipment to the site. During tunnel construction, issues such as weak rock formations, water leakage, and landslide risks have been encountered, but technical teams are continuously addressing these challenges to keep the work on track, said project director Pradhan.

The project has also begun to positively impact the local economy. Hundreds of local residents have gained employment during the construction phase, while economic activity has increased in transport, hotels, restaurants, and service sectors. Improved road access has also made it easier to bring local products to market.

Locals expect the project to further contribute to infrastructure development, education, health services, employment, and commercialization of local products. According to Chairperson Lokendra Bahadur Ghale of Chame Rural Municipality, if royalties from the project are effectively invested in education, health, agriculture, and tourism, it could significantly support long-term development.

However, stakeholders have also emphasized the need for caution regarding possible environmental impacts. According to the Annapurna Conservation Area Project (ACAP) Manang unit, changes in the river’s natural flow could affect aquatic biodiversity, and mitigation measures are being implemented as per the Environmental Impact Assessment (EIA).

With expectations of contributing to energy production, local development, and the national economy, the Manang Marsyangdi Hydropower Project is seen as an important initiative connecting Manang to the national energy grid.

Nepal Purbadhar

[ 3 Jun 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries