energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Siddhababa Tunnel pushes for November trial despite slow progress

The Siddhababa Tunnel along the Butwal-Palpa section of the Siddhartha Highway is targeted for trial operation by mid-November, but with only 70 percent of the project completed so far, questions remain over whether the deadline can be met.

The tunnel is being constructed in the Upper Siddhababa area to provide a safer alternative through one of the most landslide-prone sections of the highway. The project office says road construction and other civil works inside the tunnel have been completed, while several key electromechanical and safety installations are still pending.

Project Chief Nawaraj Bastola said around 70 percent of the overall work had been completed and that trial operation could begin by mid-November if equipment being brought from China arrives on time.

Paving inside the tunnel has been completed and painting is underway. Finishing work on the technical building is also in progress, while floor and wall lining work is nearing completion.

However, major electromechanical works - including installation of firefighting systems, CCTV cameras, electric lights and ventilation equipment - are yet to be completed, Bastola said.

The delivery of equipment from China has been delayed due to the monsoon. “The truck carrying the equipment is currently at the customs office. If the items arrive on time, the tunnel can be brought into trial operation by mid-November,” Bastola said.

He added that construction work had been halted at several points because of natural and technical challenges.

Safety improvement works outside the tunnel will begin after the internal works are completed. These works include construction of rock sheds, rockfall protection structures, barriers and slope protection measures to reduce the risk of landslides around the tunnel.

The tunnel is being constructed by China State Construction Engineering Corporation under an Engineering, Procurement and Construction (EPC) contract. The main tunnel is 1,126 meters long.

The breakthrough of the main tunnel was achieved on January 24, 2025. The Swiss Agency for Development and Cooperation prepared the feasibility study and detailed project report in 2075 BS. An international bidding process was launched on May 15, 2021, and a contract worth Rs 7.34 billion was signed with China State Construction Engineering Corporation on March 9, 2022.

Construction began a year later. Located at Dobhan Siddhababa in Tinau Rural Municipality-3 of Palpa, the tunnel is 1,126 meters long and designed as a two-lane tunnel.

After completion, the construction company will be responsible for the tunnel’s operation, maintenance and safety management for five years. The project is expected to make travel through the Siddhababa section safer, particularly during the monsoon when the area remains highly vulnerable to landslides, falling rocks and debris flows.

The project’s official completion date is March 2027, but authorities are now aiming to bring the main tunnel into trial operation several months earlier.

By Rekha Bhusal

[ 28 Jul 2026 / nagariknetwork.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries