energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Hydropower firms with poor finances ‘lure’ public investors amid regulatory gaps

Weak regulation and poor oversight have exposed small investors to risks from business entities, including hydropower companies, that go public by issuing shares.

Speaking at a program on Tuesday, hydropower developers said a number of companies in poor financial health have been converting into public limited companies just to gather money from general people to fulfill their vested interests.

“In many cases, the promoters are found leaving the companies by offloading their shares after the private companies convert into public limited companies, it has created unlimited risks to people who invest their money in general shares floated by the companies,” said Kumar Pandey, former vice-president of the Independent Power Producers’ Association, Nepal (IPPAN).

According to IPPAN, more than 100 hydropower companies are now listed in the Nepal Stock Exchange (NEPSE). Additionally, 40 other hydropower companies have been waiting for the regulator’s approval to issue their initial public offering (IPOs).

As per the financial report published by the hydropower companies, almost half of them underwent financial losses in the last two fiscal years. Many of them were found to have manipulated their financial reports to show profits before issuing their IPOs.

The hydropower producers can apply for IPOs with the regulatory body after they complete 50 percent of their construction. Likewise, they can float the primary shares following completion of 65 percent of the work. “The revenue generated from selling of electricity by these companies is used to settle their loans.”

Pandey added that wrong precedents have been set due to the lack of proper regulation of hydropower companies going public. According to him, additional funds out of people’s money have also been generated under various programs like ‘Janata ko Jalavidhyut Karyakram, Nepal ko Pani Janata ko Lagani’ and Hydroelectricity Investment and Development Company Ltd (HIDCL), which have risked investors’ money.

Despite the poor financial health of the hydropower companies, the share prices of these companies are found to scale up in the country’s secondary market. Over the past year, the hydropower index soared by around 1,400 points to 3,894.76 points, show the records with the NEPSE. “There is no clear correlation between the financial health of hydropower companies and the abnormal surge in their share prices,” Pandey said.

Bhagirathi Bhattarai Gyawali, member of the Electricity Regulatory Commission, sought a strong role of the board members of hydropower companies to work in the interest of the developers and small investors. “There is a need for devising mechanisms to address grievances of minority shareholders in the sector.”

Deepak Gyawali, former Minister for Water Resources, stressed on the need for minimizing corruption at both the central government and local levels to reduce installation and operation costs to ensure profits for hydropower developers.

[ 30 April, 2025 / nagariknetwork.com ]   
 
 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Electric Folded Treadmill Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries