energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Chinese Candu Reactor Sets Operating Records

Qinshan III units 1 and 2

On May 1, 2025, Unit 1 of the Qinshan Phase III nuclear power plant in Zhejiang province, near Shanghai, was taken offline after operating continuously for 738 days. This milestone set a new record for the longest uninterrupted operation of a power reactor in China and established a global record for a Candu-6 reactor, according to the China National Nuclear Corporation (CNNC).

The operating cycle, which began on April 24, 2023, saw Qinshan III Unit 1 generate over 12.5 billion kilowatt-hours of electricity. This output is equivalent to reducing standard coal consumption by 3.8 million tonnes and cutting carbon dioxide emissions by 9.97 million tonnes, CNNC reported. The achievement highlights the plant’s role in supporting sustainable energy production.

Candu-6 reactors, a type of pressurized heavy water reactor (PHWR), are designed to allow refueling without shutdowns. Nine such reactors operate globally, including units at Romania’s Cernavoda plant, Argentina’s Embalse plant, Canada’s Point Lepreau plant, South Korea’s Wolsong plant, and both units of China’s Qinshan III plant. The global record for continuous nuclear reactor operation is held by Canada’s Darlington Unit 1, another PHWR, which ran for 1,106 days until February 5, 2021.

Qinshan Phase III, primarily owned by CNNC, features two Candu-6 reactors built with Atomic Energy of Canada Limited (AECL) as the main contractor on a turnkey basis. Construction started in 1997, with Unit 1 beginning operations in September 2002 and Unit 2 in April 2003. As the reactors near the end of their 30-year design life, the Third Qinshan Nuclear Power Company is implementing a refurbishment program to extend their operational life by an additional 30 years.

The refurbishment involves upgrading the reactors’ fuel channels and auxiliary components. Candu reactors use a large horizontal calandria vessel with 480 tubes for high-temperature cooling water flow. Each tube has end fittings that allow isolation for fuel bundle replacement without shutting down the reactor. The refurbishment process requires dismantling thousands of components to ensure continued reliability and efficiency.

This record-breaking operation and ongoing refurbishment efforts demonstrate the Qinshan III plant’s commitment to providing stable, low-carbon energy while maintaining high operational standards. The project underscores advancements in nuclear technology and its contribution to sustainable energy goals.

by world nuclear news

[ 7 May, 2025 / world-energy.org ]   
 

4th Nepal Electric, Power & Lights International Expo

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries