energyNP.com  
Tel
98510-91900¡¡
Email
energyNP@hotmail.com¡¡
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  81% progress under civil works found in Rahughat hydro

A high level team of government officials inspected the 40 MW Rahughat Hydropower Project in Myagdi of Gandaki Province on Sunday.

Managing Director of Nepal Electricity Authority Hitendra Dev Shakya with the Secretary of the Ministry of Energy, Water Resources and Irrigation Suresh Acharya and Indian Ambassador to Nepal Naveen Srivastava inspected the project and discussed with project officials the progress of the project and construction work.

The project is being constructed by Raghuganga Hydropower Limited, a subsidiary of Nepal Electricity Authority.

The project, which has a total estimated cost of Rs. 9.17 billion, has been accelerated by obtaining USD 67 million as a concessional loan from EXIM BANK OF INDIA, while the remaining amount has been jointly invested by the government and the Authority.

According to the NEA, the team held discussions with concerned bodies of the project at the project construction site itself regarding the progress of the project, the condition of the work site, the problems encountered while working on the site, and the facilitation needed to complete the work on time.

The target is to complete the project by mid-July 2026. The construction work of the project has been divided into two lots, namely civil and hydromechanical work, and electromechanical work. A contract agreement has been signed with the contractor Jaiprakash Associates Limited, India for hydromechanical work and work is currently under way.

The civil work includes dam, intake, desander, tunnel, surge shaft, pressure shaft, power house and other works. So far, about 81 per cent physical progress has been made under the civil work, said the NEA.

For electromechanical work of this project, a contract agreement has been signed with the contractor Bharat Heavy Electrical Limited, India and electromechanical related work is being carried out.

Under the electromechanical work, the supply and installation of equipment, including turbines, generators and transformers are being carried out. So far, the progress of the electromechanical work is about 50 per cent.

The electricity generated from the project will be connected to the national grid through the Dana-Kushma 220 kV transmission line.

After the project is completed, it is expected to make a significant contribution to solving the problem of energy supply and to contribute to the proper utilisation of local resources and national economic and social development.

[ 2 June, 2025 / risingnepaldaily.com ]¡¡¡¡¡¡
 
¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries