energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  WB positive to conclude financial management of Upper Arun Hydroelectric Project soon

The World Bank (WB) has expressed its consent to expedite construction of the Upper Arun Hydroelectric Project after Nepal solves a land acquisition issue in the project related areas.

In a meeting with Energy Minister Deepak Khadka on Thursday, the WB’s South Asia Director Pankaj Gupta said the multilateral lending institution has kept the Upper Arun Hydroelectric Project (UAHP) in high priority. In response to Minister Khadka’s concern that delays in finalizing financial management had pushed the UAHP into uncertainty, Regional Director Gupta expressed that the WB is ready to finalise left over procedures to take the project into conclusion.

Although the World Bank committed to arranging financing for the project a year ago, it has reportedly shown reluctance due to India's interest in the 1,063 MW semi-reservoir project. An Indian Company Sutlej Jalvidyut Nigam has been insisting on getting the contract for all the projects based in the Arun basin including 900 MW Arun III project and 210-km long transmission line in the region.

While the government has planned to build the project, the Indian company has been putting pressure at the political and diplomatic level to grab the contract for the mega hydropower project proposed to be built in Bhot-khola Rural Municipality of Sankhuwasabha. Earlier, India had urged the WB to reconsider its involvement in the project due to ongoing Indian-led projects downstream of the Arun River.

Nepal Electricity Authority (NEA) through a subsidiary company ‘Upper Arun Hydro-Electric Limited has already carried out study on various aspects of the project. Time and again, the government has been requesting the WB to take forward the financial management of the project which was supposed to start a year ago.

Upper Arun is a game changer project of Nepal which is expected to operate at full capacity for six hours a day during the six months of winter when there is a high demand for electricity. The project that will produce around 4.53 billion units of electricity annually is estimated to cost US $2.24 billion.

In an agreement reached between the government and the WB in April, 2024, the multilateral institution had assured to start construction of the project from the beginning of 2026.

[ 13 June, 2025 / nagariknetwork.com ]   
 
 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries