energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Chino Khola Hydropower concludes financial closure with Rs 1.35 billion Everest Bank loan

Chino Khola Hydropower Project has officially achieved financial closure following the signing of a loan agreement worth NPR 1.35 billion with Everest Bank Ltd. The landmark agreement reached marks a critical milestone in the development of the 7.9 MW project, paving the way for full-scale construction to begin.

The term loan agreement - amounting to NPR 1,35,28,00,000 (One Billion, Three Hundred Fifty-Two Million, Eight Hundred Thousand Rupees) - was signed on Tuesday at Everest Bank’s head office in Lazimpat, Kathmandu. The document was formally exchanged between Sudesh Khaling, CEO of Everest Bank Ltd, and Bijay Bahadur Shrestha, Chairman of Chino Hydropower Ltd (CHL).

The financing will cover key capital expenditures required for the development of the Chino Khola Hydropower Project (CKHP), which is located in Nasong Rural Municipality, Tachhai Village, Ward No. 8, Manang District. The capital costs include land acquisition, civil construction, procurement of hydro-mechanical and electro-mechanical equipment, transmission lines, and interest during the construction period.

CHL, a Special Purpose Vehicle (SPV) established by Butwal Power Company Limited (BPC) on July 9, 2023, is the developer and operator of the CKHP. The project received its generation license in July 2022, and its Environmental Impact Assessment (EIA) was approved by the Ministry of Forest and Environment (MoFE) on Ashadh 20, 2079 (July 4, 2022).

The Power Purchase Agreement (PPA) with Nepal Electricity Authority (NEA) was signed on 2082/01/14, fixing the Required Commercial Operation Date (RCOD) for Baisakh 13, 2084 - exactly two years from the PPA date. The Engineering, Procurement, and Construction (EPC) contract has been awarded to QYEC Construction Pvt. Ltd, with site mobilization already underway as of March 25, 2025.

With financial closure now secured, CHL is positioned to accelerate construction activities and meet the targeted commissioning timeline.

Founded in 1965, Butwal Power Company (BPC) is a leading listed entity in Nepal’s energy sector with over six decades of experience. The company is engaged in electricity generation and distribution, as well as providing engineering consultancy and manufacturing of hydropower-related equipment through its subsidiaries. BPC is also recognized for pioneering capacity-building initiatives in Nepal’s hydropower development.

The successful financial closure of the Chino Khola Hydropower Project reinforces investor confidence in Nepal’s small and medium-sized hydropower ventures and demonstrates the growing role of domestic financial institutions in supporting sustainable infrastructure development.

[ 18 June, 2025 / nagariknetwork.com ]   
 
 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries