energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Bangladesh Rooppur NPP takes another step towards the pivotal event

The first unit of the Rooppur nuclear power plant, located 160 kilometers from Dhaka, Bangladesh, completed a critical blowdown of its fresh steam pipelines in the turbine compartment. The process utilized steam at 2.0 MPa pressure and 200 degrees Celsius, marking a significant milestone in the plant’s commissioning phase. Rosatom, the project’s developer, noted that this step confirms the steam lines’ readiness to supply the turbine, a key component of the unit’s operation.

The blowdown, which released steam into the atmosphere, is part of the cold and hot functional tests that began in July 2025. These tests clean the pipelines and assess equipment reliability under conditions mimicking actual operations. Rosatom indicated that further blowdowns with increased steam volumes will finalize pipeline cleaning and refine equipment performance parameters. Hydraulic tests of the primary circuit and leak tests on the containment building were successfully completed in March and June 2025, respectively.

Atomstroyexport, a Rosatom subsidiary, explained that these tests involve heating the reactor unit to evaluate the performance of critical components like pumps, pipelines, and heat exchangers under load. This ensures the plant’s systems are prepared for long-term, reliable operation. Alexey Deriy, Vice President of Atomstroyexport for Projects in Bangladesh, stated: “With the completion of this stage of commissioning works, the Rooppur NPP takes another step towards the pivotal event, such as launching of power unit No 1 and its subsequent connection to the power grid, which will supply the country's residents with additional energy, vital for both the economy and industry. In the future, the Rooppur NPP built according to the latest Russian VVER-1200 design, is expected to supply Bangladesh with up to 10% of clean energy for decades to come.”

The Rooppur project, initiated through a $12.65 billion contract signed in December 2015 with the Bangladesh Atomic Energy Commission, involves constructing two VVER-1200 reactors. Site preparations began in June 2016, with construction starting on Unit 1 in November 2017 and Unit 2 in July 2018. Each unit is designed for a 60-year operational life, with a potential 20-year extension. The delivery of nuclear fuel in October 2023 designated the site as a nuclear facility.

Rosatom aims to connect Rooppur Unit 1 to the national grid in 2025, enhancing Bangladesh’s energy supply and supporting economic and industrial growth with clean, sustainable power.

by world nuclear news

[ 6 August, 2025 / world-energy.org ]   
 

4th Nepal Electric, Power & Lights International Expo

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries