energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Rasuwagadhi Hydropower resumes partial operation after flood damage

The Rasuwagadhi Hydropower Project in Rasuwa, built under the leadership of Chilime Hydropower Company, a subsidiary of the Nepal Electricity Authority (NEA), has come back into partial operation after undergoing repairs.

The project had sustained major damage to its dam and headworks after a glacial lake outburst flood (GLOF) from the Lhende River in Tibet on July 8.

Following repairs to the headworks, one of the three units at the powerhouse was brought into operation from Saturday by temporarily diverting the river. The project, which has an installed capacity of 111 MW, now generates 37 MW from the functioning unit.

According to NEA Managing Director Manoj Silwal, the remaining two units will be brought online within a month, while the remaining reconstruction of the headworks area will be completed before the next monsoon season. He said the project’s revival was made possible through the dedicated efforts of officials and staff from NEA, Chilime, and Rasuwagadhi Hydropower Company. “With electricity generation resuming, winter demand management will become relatively easier,” he added.

The flood had swept away machines and equipment such as logs, debris-blocking systems, gates, and other components in the headworks area. Buildings around the headworks were buried under more than two meters of sludge, large boulders had washed in, and structures built to divert water into the tunnel were damaged. The tailrace, used to discharge water after generation, was filled, submerging the turbine floor completely.

On the day of the disaster, 22 workers at the hydropower site were rescued by an Army helicopter from the headworks and residential areas. The staff housing area was entirely swept away. The landslide triggered by the flood also blocked several sections of the main road from Syafrubesi to the project site.

The project had begun commercial electricity production on December 31, 2024, but operations had been halted since the flood in July. Once fully operational, the project is expected to generate 613.87 million units of electricity annually, bringing in an estimated Rs 3.25 billion in yearly revenue for the company.

[ 7 December, 2025 / nagariknetwork.com ]   
 
 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries