energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Final Stage of Pipeline Installation Achieved in Rahughat Hydropower Tunnel

The pipeline installation work in the tunnel of the 40-megawatt Rahughat Hydropower Project, under construction in Rahuganga Rural Municipality, Myagdi, by Nepal Electricity Authority’s subsidiary company, Raghuganga Hydropower Limited, has reached its final stage. The project has intensified structural work with the goal of beginning trial production within the next three months.

According to the project, the installation of steel pipes (penstocks) inside the tunnel, joint welding, anchor blocks, and protective structures are being finalized. Alongside this, work related to the installation of the powerhouse, switchyard, transmission structures, and electro-mechanical equipment is also being carried out simultaneously.

Raghuganga Hydropower Limited has stated that, after completing the tunnel and pipeline installation, the project will enter the stages of water filling, pressure testing, and equipment testing. Once the trial production is successful, electricity from the project will be connected to the national transmission line.

According to the project management, the construction work is being carried out in coordination with local authorities, consumer committees, and other stakeholders. ‘The main structural work has reached its final stage. If the weather cooperates, we are focused on starting trial production within the scheduled time,’ said an official associated with the project.

Once operational, the project being constructed in Raghuganga Rural Municipality is expected to improve electricity supply in Myagdi district and surrounding areas. The project is also expected to generate local employment, boost infrastructure development, and have a positive impact on the local economy.

The Rahughat Hydropower Project, being carried out through a subsidiary of the Nepal Electricity Authority, is considered one of the key projects to strengthen the national electricity system. Once completed, it is also expected to help reduce electricity shortages during the winter season.

Jalasarokar

[ 5 January 2026 / nepalenergyforum.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries