energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Govt to develop 328MW Bharbung reservoir-based hydropower project in Dolpa

The government is set to develop the 328.10-megawatt Bharbung reservoir-based hydropower project in Dolpa, with an estimated cost of Rs 103.31 billion.

The project is being promoted by the Department of Electricity Development and will affect areas of Chharka Tangsong Rural Municipality wards 4 and 5 and Kaike Rural Municipality ward 1 in Dolpa district.

Under the Bharbung reservoir system, a 169-metre-high dam will be constructed in Chharka Tangsong–4. The project also includes a 766.1-metre diversion tunnel, intake structures, and a 16-kilometre headrace tunnel. An underground powerhouse and tailrace tunnel will be built in Chharka Tangsong–4 and Kaike–1.

Some areas of Chharka Tangsong–5 will be submerged due to the reservoir.

Water diverted from Tatu Khola will be released into the reservoir to be built on the Bharbung River. The two systems combined are expected to generate 933.195 gigawatt-hours of electricity annually.

The project, which utilizes water from the Bharbung River and Tatu Khola, is currently in the approval stage of its Environmental Impact Assessment (EIA) report. Physical structures of the project will be located within Chharka Tangsong and Kaike rural municipalities.

Out of the total cost of Rs 103.31 billion, the project has earmarked Rs 600,000 as environmental enhancement cost, while environmental mitigation cost is estimated at Rs 12.42 million and environmental monitoring cost at Rs 7.8 million. Including land acquisition, plantation, and corporate social responsibility activities, the total environmental cost is estimated at Rs 2.44 billion.

The cost of land acquisition for the project is estimated at Rs 1.95 billion for government land and Rs 2.996 million for privately-owned land plots.

[ 22 January 2026 / nagariknetwork.com ]   
 

Lithium Iron Phoaphate (Lifepo4) Battery - Wall Mounted Energy Storage Lithium Battery - Nepal - Kathmandu

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries