energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Suryakunda Hydropower to open second phase of IPO from Feb 1

Suryakunda Hydropower Limited is set to issue shares to the general public from Magh 18 as part of its second phase initial public offering (IPO).

The company is moving ahead with the public issue after completing share allotment for local residents and Nepalis working abroad. In this phase, Suryakunda will offer 572,431 ordinary shares to the general public at a face value of Rs 100 per share, amounting to Rs 57.24 million.

Investors can apply for a minimum of 10 shares and a maximum of 50,000 shares until February 4.

The company has received approval to issue 20 percent of its paid-up capital - equivalent to Rs 137.53 million - out of a total issued capital of Rs 685.67 million.

For the IPO, CARE Ratings Nepal has assigned Suryakunda Hydropower a CARE-NP BB- (Issuer Rating), indicating a moderate level of risk in the company’s capacity to meet its financial obligations.

Kumari Capital has been appointed as the issue and sales manager for the IPO.

Suryakunda Hydropower Limited is currently generating electricity commercially from its 11-megawatt Upper Tadi Khola Hydropower Project. The total cost of the project stands at Rs 2.36 billion, with a per-megawatt cost of Rs 215.3 million. The project’s payback period is estimated at 7.71 years.

Electricity generated by the project has been supplied to the Nepal Electricity Authority since last Shrawan. The project is located in Dupcheshwar Rural Municipality of Nuwakot district.

As of the first quarter of the current fiscal year, the company’s net worth per share stands at Rs 96.05, while earnings per share are Rs 5.08. During this period, the company has accumulated losses amounting to Rs 21.8 million.

Api Power holds the largest stake in the project with a 59.67 percent shareholding. Company Chairperson Sanjeev Neupane owns 10,000 shares in his personal name.

[ 22 January 2026 / nagariknetwork.com ]   
 

Lithium Iron Phoaphate (Lifepo4) Battery - Wall Mounted Energy Storage Lithium Battery - Nepal - Kathmandu

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries