energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Experts urge govt to prioritise bond-based financing over equity for mega infrastructure

Energy sector experts have urged the government to prioritise bond-based financing over equity funding to develop large infrastructure projects, including hydropower schemes.

Speaking at a programme in the capital on Tuesday, analysts said the government should rely more on long-term credit instruments instead of depending largely on traditional financing models. At present, most mega projects are developed under public-private partnership (PPP) arrangements, with promoters investing equity and a portion of the cost raised through public share issuance.

Arjun Kumar Gautam, former chief executive officer of the Hydroelectricity Investment and Development Company Limited (HIDCL), said the bond market must be promoted alongside equity-based financing in the hydropower sector.
“Although institutions such as HIDCL are in place to support commercial financing, weaknesses in government mechanisms have held back the promotion of bond-based funding,” Gautam said.

The government recently finalised the financing modality for the 1,200 MW Budhi Gandaki reservoir-based hydropower project. As the project is being developed with domestic investment, the proposed model sets a 70:30 loan-to-equity ratio.

Of the estimated investment of Rs 248 billion, the government will hold an 80 percent stake in Budhi Gandaki Company Limited, the project promoter, while the Nepal Electricity Authority (NEA) will own the remaining 20 percent.

Prabal Adhikari, former deputy managing director of the NEA, said equity-based financing is less attractive to investors because it offers returns only in the long run.
He expressed concern over the repeated reliance on NEA for equity contributions in mega hydropower projects. “Overburdening NEA with equity investments could weaken its financial health,” Adhikari said, adding that investors need assurances of fixed returns, similar to bonds, to channel capital into infrastructure.

Stakeholders also highlighted weaknesses in financial assessments of most hydropower projects. Energy expert Dipak Gyawali said reservoir-based projects should be evaluated for multipurpose benefits rather than electricity generation alone.

“There is a need to quantify non-electrical benefits to maximise financial returns from such projects,” he said.

Participants also raised concerns over the lack of crowdfunding mechanisms, suboptimal use of installed capacity, tariff considerations in the Indian market, and inadequate risk assessment.

Madhu Sudan Adhikari, a member of the Electricity Regulatory Commission, said hydropower projects in Nepal suffer from poor coordination between financial, business and engineering aspects.
“Most projects focus heavily on construction, while economic optimisation receives little attention,” he said.

Adhikari added that the commission is preparing a separate directive on tariffs for storage hydropower projects.

“It will address issues related to differential tariffs, depreciation recovery and tax concessions,” he said.

[ 28 January 2026 / nagariknetwork.com ]   
 

Lithium Iron Phoaphate (Lifepo4) Battery - Wall Mounted Energy Storage Lithium Battery - Nepal - Kathmandu

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries