energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Kalikot locals urge Phukot Karnali work to resume

Photo: Premraj Simkhada/TRN The construction site of the Phukot Hydroelectricity Project.

Local people have drawn the attention of the District Administration Office of Kalikot, demanding that work on the Phukot Karnali semi-reservoir hydropower project be resumed. Citing the prolonged halt in construction, locals have urged the construction company, through the administration, to restart the project.

The Vidhyut Utpadan Company Limited had begun work after obtaining permission from the Department of Electricity Development in 2018 for a survey of the 480-MW project in Kalikot district. But construction work of the Phukot Karnali semi-reservoir hydropower project has remained stalled for the past two years.

The project came to a standstill after a case was filed in court following an agreement made by then prime minister Pushpa Kamal Dahal Prachanda to allocate 51 per cent of the project’s shares to an Indian company. Although the case has since been dismissed, locals say the company has yet to resume work and have therefore sought the administration’s intervention.

Chief District Officer Gokarna Raj Suyal said that locals had demanded the resumption of construction.

However, according to him, he understood that the project could not move forward as the full text of the court verdict has not yet been received, and the Indian company NHPC India Limited, which holds the 51 per cent stake, has also raised various issues.

Work will only proceed once certain ambiguities between the Nepali and Indian companies are clarified, said Suyal.

The right side of the project dam lies in Sanni Triveni Rural Municipality–3, while the left side is in Khadachakra Municipality–1. The project study report states that the main dam will have a height of 160 metres from the foundation and 109 metres from the riverbed level. The crest length of the dam will be 313 metres, with a width of 10 metres.

Land acquisition for the project has already been completed. More than Rs. 450 million has been spent on compensation to local residents. A total of 1,075 ropanis of land is to be acquired for the project. Although most of the land acquisition has been completed, construction work has yet to move forward.

The plan includes excavating a 520-metre test tunnel at Sisnegada in Sanni Triveni-3, constructing a 160-metre-high dam, and connecting the project through a 13.5-km tunnel to a power station to be built at Bhautegada in Sanni Triveni–1.

Responsibility for constructing the project has been awarded to an Indian government-owned company. Although the dismissal of the case opposing the handover of the project to an Indian company has cleared the way for construction to move ahead, work has still not begun. The total estimated cost of the project, including interest, is Rs. 92 billion.

By Prem Raj Simkhada

[ 29 January 2026 / risingnepaldaily.com ]   
 

Lithium Iron Phoaphate (Lifepo4) Battery - Wall Mounted Energy Storage Lithium Battery - Nepal - Kathmandu

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries