energyNP.com  
Tel
98510-91900¡¡
Email

Er.energyNP@Gmail.com

      ¡¡ energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Lead Acid Battery
¡¡LiFePO4 Battery
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Government Prioritizes High-Capacity Transmission Line Construction

The government has unveiled clear timelines for the construction of high-capacity transmission lines aimed at delivering generated electricity to major load centers and selling surplus energy in regional and sub-regional markets. The Ministry of Energy, Water Resources and Irrigation made transmission infrastructure expansion a priority while publishing the Electricity Consumption Growth and Energy Export Strategy, 2025.

According to the strategy, the long-delayed Hetauda-Dhalkebar section of the Hetauda-Dhalkebar-Inaruwa transmission line is targeted for completion by the end of the current fiscal year. The Dhalkebar-Inaruwa section has already been completed. The project, which faced delays due to tree felling, forest land use approvals, and compensation disputes, will now be accelerated after resolving these issues. The Nepal Electricity Authority has been assigned responsibility for implementation.

Similarly, the new Khimti-Barhabise-Kathmandu 400 kV transmission line is scheduled for completion by fiscal year 2028/29, while the Hetauda-Ratmate-Lapsiphedi-New Damauli-New Butwal line is planned for completion by 2030/31. The New Butwal-Lamahi line is set for completion by 2031/32, while the Lamahi-Chhinchu-Dododhara and Kimathanka-Haitar-Sitalpati lines are expected to finish by 2033/34.

Likewise, the Arun Hub-Inaruwa, Inaruwa-Anarmani, Phukot-Betan-Dododhara, and Tingla-Dudhkoshi-Dhalkebar transmission lines are targeted for completion by 2034/35. The Bheri and Seti Corridor transmission lines will also be completed during the same period, while the Dododhara-Attariya-Lamki line is scheduled for completion by 2035/36. All of these lines will have a capacity of 400 kV.

The government has also prioritized cross-border transmission lines. The Dhalkebar-Muzaffarpur line is targeted for completion by 2026/27, while the Butwal-Gorakhpur, Nanpara-Nepalgunj, Inaruwa-Purnia, Lamki-Bareilly, Lamahi-Lucknow, Nijgadh-Motihari, Chameliya-Jauljibi, and Chilime-Kerung lines are also listed as priorities.

The strategy emphasizes increasing domestic electricity consumption through smart grid development, substation modernization, and capacity expansion. It aims to raise substation capacity to 40,000 MVA by 2036/37. It also proposes expanding underground distribution systems by 2028, gradually removing subsidies on LPG gas, and promoting electric stoves.

Plans also include expanding agricultural electrification by extending feeders to farmlands, building a nationwide EV charging station network, and increasing electricity demand through electric buses and trolley buses in major cities.

Nepal¡¯s installed electricity capacity has now reached around 4,086 MW, while grid expansion has brought electricity access to nearly 98 percent of the population. Nepal has set a net-zero carbon emission target by 2045 and plans to reduce dependence on fossil fuels while increasing domestic electricity use.

Nepal has already signed a long-term agreement with India to export 10,000 MW of electricity over the next 10 years. Currently, around 1,200 MW of electricity is being imported and exported with India and Bangladesh.

Jalasarokar

[ 29 April 2026 / nepalenergyforum.com ]¡¡¡¡¡¡
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries