energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Upper Modi ‘A’ Hydropower Project Rejects Local Pressure to Halt Construction

The contractor and project sides of the under-construction 42 MW Upper Modi ‘A’ Hydropower Project in Annapurna Rural Municipality of Kaski have objected after a local struggle committee pressured them to halt the construction work. The project management has made it clear that while solutions will be sought through dialogue, the work will not be stopped.

Construction entrepreneur Kiran Malla described the move by the local struggle committee as “anarchy.” According to Malla, chairman of High Himalaya Hydro Construction, local demands should be presented to the project promoter, Upper Modi Limited, and obstructing the contractor directly is a wrong practice.

He said that with heavy investment, equipment, and manpower already mobilized, even a one- or two-day work stoppage could cause financial losses ranging from millions to tens of millions of rupees. He also termed the committee’s actions as unlawful interference.

Project Manager Deepak Bhusal said most of the local demands had already been addressed and informed that a high-level management team would soon visit the site to discuss the remaining issues. According to him, continuous dialogue is being held with the ward chairperson and local representatives, and locals should place their demands directly with the promoter company rather than the contractor.

He stressed that construction work would not be halted under any circumstances.

Although some dissatisfaction and demands remain among locals, the project side stated it is ready to address them. However, it emphasized that direct obstruction of development works would not be acceptable and called for cooperation from all sides to complete the project on time.

Economically, the project is considered significant. The total estimated cost is Rs 10.57 billion, with 70 percent debt financing and 30 percent equity investment. The lead investor, NMB Bank, has invested around Rs 4.40 billion, while co-investor Hydroelectricity Investment and Development Company Limited has invested nearly Rs 3 billion.

In terms of physical progress, the project is said to be in a satisfactory condition. Construction began around a year ago, and the access road has already been completed. Tunnel excavation has progressed between 101 and 110 meters, while powerhouse construction is also moving ahead rapidly.

The project is being developed with a target completion period of four and a half to five years under the government’s energy policy, aiming for completion by fiscal year 2028/29.

The contract for Lot 1 of the project has been awarded to a joint venture between China’s Sichuan Shutian Construction Company and Nepal’s High Himalaya Company.

Urjasanchar

[ 3 May 2026 / risingnepaldaily.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries