energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Kalanga Hydro to Launch IPO on May 22, 2.87 Million Shares for Public

Kalanga Hydro Limited is set to issue its Initial Public Offering (IPO) to the general public starting from May 22. After allocating shares reserved for local residents of the project-affected area and Nepalis working abroad, the company is now opening the IPO to the general public in the second phase.

The company had received approval to issue 4.9 million shares, equivalent to 35 percent of its issued capital of NPR 1.40 billion. Out of this, 1.4 million shares have already been allotted to local residents and 350,000 shares to Nepalis employed abroad. Additionally, 195,000 shares were reserved for mutual funds and 105,000 shares for employees.

The company will now issue the remaining 2.87 million shares worth NPR 287 million at a face value of NPR 100 per share to the general public.

Investors can apply for a minimum of 10 shares and a maximum of 20,000 shares. The application deadline is as early as May 26 and no later than June 4, according to the company.

For the IPO issuance, Care Ratings Nepal has assigned the company a “CARE-NP BB” issuer rating, indicating a moderate level of risk in meeting its financial obligations.

The company’s 15.33 MW Kalangagad Hydropower Project has a total cost exceeding NPR 4.33 billion, with a per megawatt cost of over NPR 280 million. The project still has more than 25 years remaining on its power generation license.

The simple payback period of the project is 9.29 years, while the discounted payback period is 18.01 years. The project has been in commercial operation since February 10, 2023.

Sanima Capital Limited has been appointed as the issue and sales manager. Investors can apply through ASBA-participating banks and financial institutions using the C-ASBA system, as well as via the “Mero Share” online platform of CDS and Clearing Limited.

Jalasarokar

[ 5 May 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries