energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Upper Arun Hydropower Project Moves Ahead with Production Permit

The 1,063 MW Upper Arun Hydroelectric Project, which is being developed by Upper Arun Hydro-Electric Limited, a subsidiary company of the Nepal Electricity Authority, in Bhotkhola Rural Municipality of Sankhuwasabha, has received a power generation license.

The Department of Electricity Development granted the license to the project in accordance with a secretary-level decision made by the Ministry of Energy, Water Resources and Irrigation on 27 April.

Preparatory works required to begin construction of the project have almost reached the final stage. So far, acquisition of 413 ropanis of land required for the project has been completed.

Construction of the 21.19-kilometer access road from Chhorang in Bhotkhola Rural Municipality–4 to Rukuma Phedi in Bhotkhola Rural Municipality–2 is also nearing completion. Since February/ March 2025, construction materials have been transported by helicopter to accelerate the access road works.

Construction of permanent housing and other structures required for project workers has also reached the final stage. Permanent resettlement of 23 households fully displaced by the project has already been completed, while compensation and various empowerment programs are being implemented for 335 economically affected households.

The distribution of compensation for land acquisition has also been completed by 98 percent.

Preparations are also underway for the Power Purchase Agreement (PPA) with the Nepal Electricity Authority. Separate packages are being prepared and bid documents are under development for the construction of civil structures, electro-mechanical works, hydro-mechanical works, and transmission lines.

Under the project, a dam measuring 183 meters in length and 100 meters in height will be constructed around 350 meters upstream from the confluence of the Arun River and Chepuwa Khola. Water from the river will be diverted through an intake into an 8,362-meter-long headrace tunnel and then through a surge tank into an underground powerhouse measuring 25 meters wide.

The project is designed to operate 6 hours daily during peak hours, with an average output of 697 MW throughout the year. It is estimated to generate 4,531 GWh of electricity annually. The generated power will be connected to the proposed Arun Hub Substation through a 5.8-kilometer-long 400 kV transmission line.

The project cost is estimated at around NPR 240 billion. The financing structure includes 70 percent debt and 30 percent equity. A co-financing agreement worth NPR 53.341 billion has already been signed in 2022 under the leadership of the Hydroelectricity Investment and Development Company Limited. Discussions are also ongoing with the World Bank for debt financing.

The Environmental Impact Assessment (EIA) report was approved on 3 January, 2025. The project was first studied in 1991, revisited in 2011, and is being developed based on an updated feasibility study conducted in 2021. The project is targeted for completion within 68 months from the start of construction.

Biznessnews

[ 15 May 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries