energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Uttarganga 828 MW Reservoir Hydropower Project Moves Into Construction Phase After Two Decades of Delay

The long-awaited 828 MW “Uttarganga Reservoir Hydropower Project,” which will be built in the Dhorpatan area of Baglung, has moved forward into the construction process. The project, which has been under discussion for two decades, has now entered the implementation phase with detailed preparations.

Promoted by Uttarganga Power Company Limited, a subsidiary of the Nepal Electricity Authority, the project is expected to generate stable electricity even during the winter season after completion, contributing significantly to energy security.

The total estimated cost of the project has reached 1.08 billion US dollars, equivalent to about NPR 164 billion. Due to increased costs compared to initial estimates, the cost per megawatt is expected to reach around NPR 19 million. The rise in the US dollar exchange rate against the Nepali currency is considered the main reason for the cost escalation.

Although the project has been under discussion since 2004, its Environmental Impact Assessment (EIA) report submitted in 2019, was only approved in 2023. The Department of Electricity Development has now made the detailed project report public and has requested affected stakeholders to provide suggestions and feedback within 35 days.

Under this project in Dhorpatan, Baglung, a 200-meter-high and 840-meter-long rock-fill dam will be constructed on the Uttarganga River. The reservoir formed behind the dam will be 14 kilometers long, with a usable water storage capacity of 419.98 million cubic meters.

Water collected in the reservoir will be transported through tunnels and dropped about 1,600 meters to generate electricity in two stages. The project will include two underground powerhouses, producing a total of 828 MW of electricity.

The generated power will be connected to the Nisi substation in Baglung via a 400 kV double-circuit transmission line. The project will also include the construction of access roads, tunnels, and other infrastructure.

The project aims to begin electricity generation from 2035. As a reservoir-based project, it is expected to produce electricity consistently in both wet and dry seasons. To maintain environmental balance, a minimum flow of water will also be released into the Uttarganga River year-round.

Urjasanchar

[ 18 May 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries