energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  MCC Nepal Completes 41 Towers on Cross-Border Power Line in Nawalparasi

Construction work on the transmission line under the Millennium Challenge Corporation (MCC) project is progressing rapidly in West Nawalparasi.

Under the MCC Nepal Compact, construction of transmission towers is moving ahead at a fast pace along the 18-kilometre cross-border transmission line stretching from Suryabasti in Sunwal Municipality-13 to the Nepal–India border.

Out of a total of 53 large and small towers to be constructed, 41 towers have already been completed, while the foundations of six towers are ready. Work on the remaining six towers has yet to begin, according to MCA-Nepal.

India’s TL Limited has been awarded the contract for the transmission line construction. According to the contract agreement, only two months remain for completion of the project, and MCA-Nepal said that work is being carried out with the aim of completing the transmission line within the deadline.

The substation and transmission line construction was jointly inaugurated on December 6, 2025, by the then Finance Minister Rameshwor Prasad Khanal and U.S. Ambassador Dean R. Thompson. The project said that within five months of the commencement of work, compensation distribution had been carried out and tower construction had reached its final stage.

The compensation distribution for land occupied by the towers has already been completed. Additional land was required in some locations, which has since been acquired by the project, although compensation for those plots is still pending. The compensation distribution for land beneath the transmission lines has also reached around 70 per cent completion.

Chief District Officer and Compensation Determination Committee Coordinator Dipak Raj Nepal said the compensation distribution process is in its final phase and payments have been directly transferred to the respective beneficiaries’ bank accounts.

The 315-kilometer transmission line, which begins from Lapsiphedi, will pass through the forest area of Bardaghat Ward No. 2 in Nawalparasi and extend from Sunwal-11 through Ramgram and Palhinandan Rural Municipality before connecting India.

The section within Nawalparasi will be 33 kilometres long. A total of 102 towers will be constructed in Nawalparasi district. Among them, tower construction is currently underway along a 18.2-kilometre stretch from the substation at Suryabasti of Sunwal Municipality to Palhinandan Rural Municipality.

As delays emerged in other sections, construction work in the West Nawalparasi section of the cross-border New Butwal–Gorakhpur transmission line was prioritised and moved forward earlier.

Executive Director of MCA-Nepal Khadga Bahadur Bisht said work is progressing with the target of completing the substation in Sunwal within 39 months and the transmission line connecting to the border within 21 months.

[ 23 May 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries