energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Slow progress drives National Pride Project costs up by 113 percent

Construction costs of several national pride projects are projected to increase by as much as 113 percent due to prolonged delays in implementation and slow construction progress.

The 63rd report of the Office of the Auditor General (OAG) states that Rs 104.92 billion has already been spent on six national pride projects under the Ministry of Energy, Water Resources and Irrigation (MoEWRI). However, the total cost of these projects is expected to exceed Rs 217.16 billion by the time of completion. The physical progress of the projects ranges from 26.65 percent to 82.27 percent.

According to the report, the contract process for the dam site and powerhouse of the Sunkoshi Marin Diversion Project has been completed, but a new contract agreement has yet to be signed. Similarly, the estimated cost of the Budhigandaki Hydropower Project has risen sharply from the initial projection of Rs 260 billion to nearly Rs 398 billion, with further escalation anticipated.

The report notes that Rs 45.11 billion has already been distributed as compensation for land acquisition in the Budhigandaki project area. Although the investment modality has been finalized, construction work has not yet commenced.

Among transmission line projects, progress remains minimal. The Karnali Corridor 400 kV transmission line has achieved only 24.28 percent physical progress, while the Bheri Corridor 400 kV transmission line stands at just 2 percent. The Kimathanka-Arun Hub 400 kV transmission line has progressed by 2.77 percent, and the West Seti–New Attariya 400 kV transmission line by only 0.89 percent.

Likewise, the Tamor Hub–Chhagedhunga Sanghu 220 kV transmission line has recorded only 2.63 percent progress. Under the transformational project category, MoEWRI is currently implementing two cross-border and 16 national transmission line projects.

The report further states that construction progress of the Lamabagar–Bahrabise transmission line stands at 1.11 percent, while the Sheetalpati–Dhungesanghu transmission line has achieved only 0.21 percent progress.

The financial audit of the Babai Bhada Aurahi River Management Project in Bardiya revealed that the project failed to recover Rs 20.47 million, including compensation amounts, from the contractor following contract termination. In addition, 66 projects implemented through 13 agencies under the ministry have consumed Rs 1.33 billion despite remaining incomplete.

The OAG also noted that planned construction of a supporting canal under the Lamki main canal of the Ranijamara Kulariya Irrigation Project, as well as the extension of side canals including Tribhuvan Basti under the third phase of the Mahakali Irrigation Project, has yet to begin. The delay has been attributed to the failure to secure consent for mobilizing the required resources.

According to the OAG, key factors hindering project implementation include land disputes, delays in finalizing financial modalities, inadequate budget allocation, forest-related complications, and failure to comply with action plans. These issues have contributed to significant increases in both project duration and overall costs.

In its report, the OAG has urged the concerned authorities to ensure timely completion of projects within the approved cost and quality standards. It has also emphasized the need to review the implementation status of performance agreements, address project-related obstacles promptly, strengthen inter-agency coordination, and ensure adequate funding arrangements.

[ 24 May 2026 / nagariknetwork.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries