energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Audit Report Flags Missing Electricity Revenue from Rani Jamara Irrigation Project

The Office of the Auditor General has suggested that the government make necessary arrangements after finding that there is no clear accounting of the electricity being generated under the national pride project Rani Jamara Kulariya Irrigation Project.

Through its 63rd Annual Report, the Auditor General’s Office recommended preparing an accurate record of the electricity produced by the project and recovering the revenue from electricity sales through the Nepal Electricity Authority.

The project is currently generating 4.71 MW of electricity. According to the project, regular power generation began in November/December 2023 and has been connected to the national transmission system of the Nepal Electricity Authority.

Although the project is primarily operated as an irrigation scheme, the start of electricity generation has created enthusiasm among local residents and project officials. However, a clear decision has yet to be made regarding its operational modality and revenue management. According to the project, electricity generation became possible after an eight-meter water head (elevation) was made available in the Tarai region.

The report of the Office of the Auditor General has raised concerns, stating that no decision has yet been made on how to manage the electricity generated alongside irrigation operations, on what basis the revenue earned from it should be shared, and what kind of operational structure should be adopted.

Although the Ministry of Energy, Water Resources and Irrigation has stated that necessary preparations are underway, a concrete decision has still not been reached for a long time. Earlier, on May 25, 2021, an agreement was signed between the ministry and the Nepal Electricity Authority regarding the management of electricity generated by the project.

The agreement had a validity period of one year and included a provision requiring a Power Purchase Agreement (PPA) to be signed within that period.

However, although the power plant built through the project’s irrigation canal system was brought into operation and handed over to the project on January 15, 2025, a formal Power Purchase Agreement (PPA) has still not been signed.

According to the report of the Office of the Auditor General, a total of 26.056 million units of electricity generated by the project have already been utilized by the Nepal Electricity Authority. However, the project has not yet received any payment from electricity sales.

The Auditor General’s Office has also drawn the attention of the concerned authorities, stating that although the agreement required the PPA to be completed within one year, the process still remains unresolved even after more than three years.

Jalasarokar

[ 24 May 2026 / risingnepaldaily.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries