energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Chobhar substation in final stage of construction

The construction of the 132/11 kV Chobhar substation, considered crucial to strengthening the electricity supply system in the Kathmandu Valley, has reached its final stage.

One of the two power transformers installed at the substation, which is being built in Kirtipur Municipality-6, will be charged and brought into operation immediately after Dashain, according to Nepal Electricity Authority (NEA).

Two power transformers, each with a capacity of 45 MVA, have been installed at the substation.

One circuit of the Matatirtha–Chobhar section under the Thankot–Chapagaun–Bhaktapur 132 kV double-circuit transmission line project has already been charged to supply electricity to the substation.

The Chobhar substation is expected to help meet the growing electricity demand in Kirtipur and surrounding areas, as well as around Pulchowk in Lalitpur, while improving the reliability and quality of power supply.

A team led by Managing Director of NEA Dirghayu Kumar Shrestha conducted an on-site inspection of the substation on Thursday. The team held discussions with project management officials, consultants and contractors and received updates on construction progress.

During the inspection, MD Shrestha directed the concerned officials to complete the remaining works promptly and charge the substation immediately after Dashain, as the transmission line supplying electricity to it has already been charged.

Stressing the importance of the Matatirtha–Chobhar transmission line and the Chobhar Substation in managing the growing electricity demand in the Kathmandu Valley during the upcoming winter, he called for both infrastructure projects to be given high priority and brought into operation as soon as possible.

Nine 11 kV feeder lines have been planned to distribute electricity from the Chobhar substation to local areas. Of these, three feeders will extend towards Pulchowk in Lalitpur and six towards Kirtipur.

According to NEA, the feeder line extension work is in its final stage, and the substation will be charged immediately after Dashain once the work is completed.

The Chobhar Substation was constructed as an alternative arrangement after construction work on the Thankot–Chapagaun–Bhaktapur 132 kV transmission line faced obstructions in Khokana, Bungamati, Harisiddhi and Lamatar areas of Lalitpur.

The construction of an approximately 4.5-kilometre-long 132 kV underground transmission line from Chobhar to Patan is also being carried out on a high-priority basis. Construction of a 132 kV substation in Patan is also underway.

The Chobhar substation has been built on 12 ropani and 12 aana of land leased from Himal Cement at Bhootkhel, Chobhar.

A Cabinet meeting held on January 31, 2022, decided to lease the land to the NEA for the construction of the substation. The substation has been constructed with concessional loans provided under the Kathmandu Valley Transmission Capacity Strengthening Project, supported by the Asian Development Bank (ADB).

[ 17 October 2026 / risingnepaldaily.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries